boiler cost for 1 ton capacity
Capacity:1-20t/h
Rated thermal efficiency: 100-104%
Fixed working pressure: ≤1.6MPa
Applicable fuel:natural gas etc.
Capacity:0.7-14MW
Rated thermal efficiency:96-98%
Fixed working pressure:≤1.25MPa
Applicable fuel:Natural gas, light oil, etc.
Capacity:0.7-2.8Mw
Rated thermal efficiency: 97.2-106%
Fixed working pressure:0.1MPa
Applicable fuel:Natural gas, etc.
Capacity:2.8-7.0Mw
Rated thermal efficiency:≥105.5%
Fixed working pressure:-0.02MPa
Applicable fuel:Natural gas, etc.
Capacity:99Kw
Rated thermal efficiency:97.2-104.4%
Fixed working pressure:1.0MPa
Applicable fuel:Natural gas, etc.
Capacity:0.5-4.0 t/h
Rated thermal efficiency:98%
Fixed working pressure:≤1.25MPa
Applicable fuel:electric energy
SO I have lots of experience with these machines! 4 years, 4 repairs (3 under warrantee). The last repair on the oldest machine lasted exactly 9 months and cost $350. I have had issues with 2 brand new machines out of the box that had to be replaced. This is the dreaded 3 beeps steam boiler fails to fill.Get Price
Feb 12, 2021 · 19-A biomass fired boiler of efficiency 60% operates 285 days in a year, it generates 25 TPH (Q1) steam for a process at pressure 21 kg/cm2 & 360 deg C temperature. Calculate the cost of fuel to operate the boiler. Assume fuel GCV 2500 kcal/kg, feed water temperature 105 deg C & cost of fuel per ton is Rs 2800. First calculate the fuel consumptionGet Price
Mar 09, 2017 · The first part of the conversion is efficiency of the boiler and combustion. Typically, the efficiency of boilers is between 70 and 80% depending on how well the boiler is maintained and what type of boiler it is. Second part is the vapour cycle efficiency. It plays a major role in steam power plants.Get Price
Nov 19, 2021 · Warranty – 1 yr for labor, 5 yrs for parts, 10 yrs for heat exchangers; Pros and Cons. There are some real bright spots with respect to the Navien NCB 240. But there are also some other aspects which I found troublesome and concerning. Here's my quick rundown: Pros: 2-in-1 Unit – Tankless Heater and Hydronic System Boiler; Compact DesignGet Price
A heat recovery boiler, an evaporative cooler or a heat exchanger is typically used to cool the gas. Cost Information: Capital costs for SO 2 scrubbers have decreased by over 30% since the beginning of the 1990's. Current costs for SO 2 scrubbers applied to electric utilities are r eported to be approximately $100/kW (Smith, 2001).Get Price
The boiler for the S1 was the largest built by the Pennsylvania Railroad; with 660 square feet (61 m 2) of direct heating surface and 500 one-inch diameter tubes and flues, the total heating surface area of S1 was 7,746 sq ft (719.6 m2), it was 99.3% as massive as the boiler for Union Pacific's 4000-class Kefid-4 locomotive, the "Big Boy". In Get Price
12" ducts, pull-out ash tray, more wood capacity which means less loading! Thermowind Model FLFA aka TW-1000 The Federal EPA laws restrict Outdoor Wood BOILERS - and this is not a BOILER! The Federal EPA also mandates that these burn coal, oil or gas, so Solid 1" steel Coal grates now come standard.Get Price
Feb 24, 2012 · As the water and steam both are in same vessel a fire tube boiler cannot produce steam at very high pressure.. Generally it can produce maximum 17.5 kg/cm 2 and with a capacity of 9 Metric Ton of steam per hour.. Types of Fire Tube Boiler. There are different types of fire tube boiler likewise, external furnace and internal furnace fire tube boiler.Get Price
Cost Information: Capital costs are significantly higher than other types of NOx controls due to the large volume of catalyst that is required. The cost of ca talyst is approximately 10,000 $/m 3 (283 $/ft 3). A 350 MMBtu/hr natural gas-fired boiler operating at 85% capacity requires approximately 17 m 3 ( 600 ft 3). For the same sized coal Get Price
Mar 09, 2017 · During installation of industrial steam boiler, 1-2 experienced engineering and technical personnel will be sent for the site representative for technical tests and installation instructions free of charge; processing the various problems …Get Price
Nov 07, 2016 · Variable capacity boiler plants (e.g., step-fired (hi/lo) boilers, modular boiler plants, modulating flame boilers); They are usually cost-effective for large boilers that have modulating flame controls. Scroll compressors are manufactured in the 1 to 15 ton range. Multiple compressors can be found in water chillers with capacities of Get Price
Dec 01, 2021 · What Was. Our home's original forced-air heating and air conditioning system, installed by the builder, was a three-ton, 80,000-Btu heating/42,000-Btu cooling unit that included a single-stage burner and a 110-volt, single-stage blower motor.Get Price
Mar 20, 2019 · During installation of industrial steam boiler, 1-2 experienced engineering and technical personnel will be sent for the site representative for technical tests and installation instructions free of charge; processing the various problems arising in the course timely while installing. 1 ton steam boiler. 2 ton steam boiler. 3 ton steam Get Price
A match, for instance, has about 1 BTU, while furnace capacities equal tens of thousands of BTU. BTU tells you how much heat per hour your furnace is capable of producing from the fuel you put in. A Note on Tonnage. Heat pumps, air conditioners and some furnaces are measured in tons. Far from being a weight measurement, one ton equals about Get Price
☐ Natural gas boiler ☐ Electric air-source heat pump ☐ ☐ actual tons are calculated based on AHRI cooling capacity divided by 12,000 Qualifying Efficiency/Rebate: ☐ SEER 18-21 and minimum EER 12 and HSPF 10 ($200/ton) ☐ SEER > 21 and minimum EER 12 and HSPF 10 ($300/ton) Date installed Invoice dateGet Price